The Gordie Howe International Bridge project is a once-in-a-generation undertaking. The project will deliver much-needed transportation improvements for international travelers, and will provide opportunities for growth to the Windsor-Detroit region.
Distinctive Features:
- Cable-stayed design with clear span of 0.53 miles – the longest main span of any cable-stayed bridge in North America.
- Three lanes in each direction with a dedicated path for pedestrians and cyclists.
- New Ports of Entry on both the US and Canadian sides. Both will be among the largest and most advanced Ports of Entry in North America.
The NEX® System is employed at this site for concrete temperature monitoring and for mass concrete specification compliance. The TruMatch™ Cure Box is being utilized to create the perfect curing environment for test cylinders on-site.